PRECONSTRUCTION

Unify the project
before breaking ground.

Our preconstruction services are offered to builders during the early stages of a project so conflicts can be resolved before breaking ground.

Coordinated residential structural model
EARLY COORDINATION MODEL

WHOLE-PROJECT UNIFICATION

One coordinated view of the decisions that shape the build.

We are the bridge between structural and architectural planning. We identify conflicts and raise conditions when a decision needs to be made. We carry the coordination work so your team can focus on clear decisions instead of chasing conflicts across separate documents.

PRECONSTRUCTION STUDIES

Some of our studies include:

Each study is built around the project’s current questions and the information available at that stage.

Windows

Coordinate openings, heads, sills, support, and surrounding construction.

HVAC + MEP

Review equipment, penetrations, clearances, and system interfaces.

Routing

Study pathways through structure and architecture before they become field conflicts.

Foundations

Check grids, bearing conditions, elevations, embeds, and base-plate relationships.

Architectural details

Unify walls, finishes, openings, edges, and project-specific assemblies.

Stairs

Coordinate geometry, landings, headroom, support, and adjacent construction.

Embedments

Develop embedment maps and studies aligned with structure and concrete.

Field conditions

Compare scans and completed work to the coordinated project model.

COORDINATION MODEL

Put the project information in one place.

We compare structural drawings, architectural layouts and details, windows, stairs, foundations, HVAC and MEP routing, grids, elevations, embedments, and field conditions in one working model.

  • Identify conflicts across project disciplines
  • Raise conditions when the project team needs to make a decision
  • Update the coordinated model as decisions are made
Coordinated erection plan
COORDINATED ERECTION PLAN
FIELD VERIFICATION + FOUNDATION LAYOUT

Align the structure to the foundation on site.

We use the coordinated model to locate each steel column. The base-plate template includes the plate perimeter and anchor-bolt holes, allowing both to be spray-painted onto the concrete.

  • Locate the structure from the coordinated project model
  • Mark base-plate outlines and anchor-bolt holes
  • Check grids, elevations, foundations, embedments, and as-built conditions
Field LiDAR scanner
FIELD VERIFICATION

THE PROCESS

How the work moves.

  1. 01
    Receive

    Gather the current plans, models, scope, studies, and schedule.

  2. 02
    Unify

    Build the whole-project working model and compare information across disciplines.

  3. 03
    Resolve

    Raise conflicts and conditions, then update the model as decisions are made.

  4. 04
    Deliver

    Provide the agreed studies, maps, drawings, files, verification, or field layout.